Over the last few months, we at Liferay Support have encountered multiple customers who were having trouble with MEMORY_CLUSTERED scheduled jobs disappearing in their clustered environments.
In trying to figure out why their clustered jobs were disappearing, we learned that the problem lay in a misunderstanding of the (undocumented) API that the customer was calling during their component deactivation. Along the way, I realized that while I had an intuition about how scheduling was supposed to work in a cluster, I’d never done a deep dive into the scheduler engine code to say for certain that any of my intuitions were correct, something that should be pretty important when working with an undocumented API.
As a disclaimer, this post is a result of an investigation to resolve that knowledge gap problem, a description of how I believe things currently work and how that way of working came to be, based on reading through commit histories and JIRA tickets.
Understanding SchedulerEngine
What is SchedulerEngineProxyBean and why is its implementation so weird?
If you look at Liferay code, you’ll see a few classes with names ending in ProxyBean. When you open them up, you’ll see that they implement some interface, but the implementation of every method of that interface does nothing except throw an UnsupportedOperationException. Looking at those, you might end up being really confused, and find them weird, but there’s a reason they’re written that way.
However, before that, a little bit of backstory.
Before OSGi, Liferay introduced a Util class for every interface in order to allow instances of classes not managed by Spring (portlets, for example) or classes that lived outside of the Liferay Spring context (third-party web applications, for example) to call instances of Liferay’s Spring-managed classes.
Before Liferay addressed the inherent performance problem of long advice chains (see Shuyang’s blog from 2011 for additional details), Util classes also functioned to instantiate advice-like wrappers around existing implementations. For example, scheduler was initially implemented so that every call to the API was converted into a message bus message, with the real scheduler engine implementation happening in a message bus worker thread.
This design of putting wrapper-like logic into a Util class resulted in a particular side-effect. Since all of the message bus routing logic lived in the Util class, this meant that if you had a reference to the Spring-managed instance of SchedulerEngine, it would invoke the method directly, since your method calls would only be routed to the message bus if you used Util instead. In LEP-7304, the message bus routing was converted into a wrapper class, but the fundamental difference between a Util class and a direct reference was maintained.
Eventually, Liferay did solve that problem of long advice chains, and LPS-14031 rewrote the API layer of scheduler so that message bus routing was implemented using an advice. This is when SchedulerEngineProxyBean was introduced.
You can think of this implementation pattern as the following:
- Start with a dummy implementation (SchedulerEngineProxyBean), usually with a name that ends with
ProxyBean - Use a factory so that Spring knows to instantiate a proxy that wraps the dummy implementation
- Use the invocatation handler provided for the proxy (MessagingProxyInvocationHandler) to convert the method call into a message bus message
- With a listener that listens to messages on the message bus destination, deserialize the message bus message and invoke the method on the real implementation
Through this proxy bean pattern, Liferay provides the API in core, and then it provides the implementation in a separate Marketplace plugin. It also provides consistency between calling the Util and calling the Spring-managed instance. You can see similar approaches in things like workflow.
With the move to OSGi, Util classes still exist, but now they exist for classes that are not managed by OSGi to call instances of OSGi-managed classes.
What kind of API did Liferay provide with SchedulerEngine?
When scheduler was first introduced in LEP-6187, it had a very simple API, which basically served as a wrapper around specific Quartz Scheduler methods. At the time, they were really just the same methods that you would call in the Quartz Quick Start Guide.
- start = Scheduler.start
- shutdown = Scheduler.shutdown
- schedule = Scheduler.scheduleJob
- unschedule = Scheduler.unscheduleJob
Later, with LPS-7391 Liferay thought it would be interesting to create a portlet that would allow you to manage scheduled jobs. So with the subtask described in LPS-7395, Liferay added an API to allow you to modify existing jobs.
Liferay also assumed that people wouldn’t want to just modify scheduled jobs, but maybe they’d want to write scheduled jobs on the fly. Therefore, Liferay also added an API method to allow you to add a Groovy script that would run at a scheduled time.
In order to make informed decisions about why a scheduled job needed to be updated, with LPS-7397, Liferay also provided an API to retrieve metadata about existing scheduled jobs.
Out of all that, Liferay thought that you might also want to know about timings of a scheduled job, so as part of LPS-7397, Liferay also provided those helper methods as well:
Another natural question to ask is also about past timings of a scheduled job.
In addition, Liferay also provided a way to interact with that metadata, by allowing you to pause and resume scheduled jobs, check whether the job had been paused, and also let you know if there were any
Unfortunately, as Liferay prepared for its 6.0 release, Liferay’s UI/UX team got pulled into designing newer features that would be added to that release, and the user interface for managing an older feature like scheduler never got designed. Ultimately, the whole idea of a built-in portlet to manage scheduled jobs ended up in the product backlog, never to be heard from again.
Why did Liferay introduce a SchedulerEngineHelper?
Later, with LPS-23998, Liferay also needed a way to derive a cron expression, based on the same concepts as Liferay’s Calendar portlet, in order to improve the way we were implementing scheduled staging. The logic was also added to SchedulerEngine, because it looked like a common concern for anything wanting to create scheduled tasks.
With LPS-25385, Liferay decided to broadcast an audit event any time that a scheduled job was fired, and so we added a method to the SchedulerEngine interface that would be called whenever a scheduled job fired.
After reflecting on this a little more, we realized that from the standpoint of separation of concerns, saying that every implementation of a SchedulerEngine needed to also provide getCronText to derive a cron expression as well as auditScheduledJob to broadcast an audit event didn’t make any sense. Additionally, addScriptingJob, wasn’t really a special function of a scheduler, either.
Therefore, with LPS-29425, we introduced a new layer, SchedulerEngineHelper, that would provide the implementation of broadcasting an audit event, while also serving as an adapter that could simplify how developers interacted with the SchedulerEngine, without requiring the SchedulerEngine to provide any implementation relating to those interactions, allowing SchedulerEngine itself to be relatively stable. We also moved any other methods that allowed you to retrieve specific metadata about a scheduled job, since getScheduledJob contained all the metadata, the individual accessors could just delegate and then retrieve the individual fields.
Understanding SchedulerEngineHelper
What changed with SchedulerEngineProxyBean in 7.x?
Let’s keep in mind what we got from SchedulerEngineProxyBean in earlier releases. Through this proxy bean pattern, Liferay provides the API in core, and then it provides the implementation in a separate Marketplace plugin.
When you think about it like that, this is the same benefit you get with OSGi. Therefore, with Liferay 7.x, Liferay decided to reimplement scheduler as OSGi-managed components, rather than Spring-managed components injected into OSGi.
As a result, we effectively lost the benefit of Spring advices. However, rather than reconsider our decision, and rather than move all the logic back to the Util again, Liferay opted to divide all the concerns related to scheduler across a long implementation chain:
- QuartzSchedulerEngine is provided as an OSGi component, disabled by default
- ModulePortalProfile uses the concept of a portal profile gatekeepers (an undocumented Liferay API that makes it easier to conditionally enable components that are disabled by default) to enable
QuartzSchedulerEngine(mentioned above) andSchedulerEngineHelerImpl(mentioned later) - QuartzSchedulerProxyMessageListener waits for a reference to
QuartzSchedulerEngineand registers itself to theliferay/scheduler_enginemessage bus destination - SchedulerEngineProxyBeanConfigurator instantiates a SchedulerEngineProxyBean, registers it as something that routes messages to the
liferay/scheduler_enginemessage bus destination (similar to the oldUtilclass in earlier Liferay releases), and registers it as an OSGi service withscheduler.engine.proxy.bean=true - A
SchedulerEngineConfigurator(which will be enabled using a portal profile gatekeeper) waits for a reference toscheduler.engine.proxy.bean=true, and on activation registers a scheduler withscheduler.engine.proxy=true- SingleSchedulerEngineConfigurator (only enabled for 7.0.x CE) registers an unclustered scheduler
- ClusterSchedulerEngineConfigurator (only enabled for 7.0.x DXP, and all releases after that when clustering was re-added to CE) registers the original unclustered scheduler if
cluster.link.enabled=false, or a clustered wrapper around the proxy bean ifcluster.link.enabled=true
- SchedulerEngineHelperImpl waits for a reference to
scheduler.engine.proxy=true
Developers who want to work with the scheduler obtain a reference to the SchedulerEngineHelper service (rather than to the SchedulerEngine service), and make calls against the provided API. Of course, that provided API isn’t well-documented right now, which causes a lot of confusion when using scheduler, so we’ll move onto documenting that next.
What new methods were added to SchedulerEngineHelper with 7.x?
When SchedulerEngineHelperImpl is activated, it will create a ServiceTracker that uses an internal class (SchedulerEventMessageListenerServiceTrackerCustomizer) to track when new instances of SchedulerEventMessageListener are registered and when existing instances are unregistered.
In other words, with 7.x, scheduled jobs are managed by creating components that provide the SchedulerEventMessageListener service.
When a new component providing the SchedulerEventMessageListener service is registered to OSGi, addingService will deactivate a thread local (used by SchedulerClusterInvokeAcceptor), populate a map that will effectively ask all callee nodes to ignore the call, broadcast the method call to the cluster (where the callee nodes will ignore it), and then attempt to add a trigger for the job on the local node.
When an existing component providing the SchedulerEventMessageListener service is unregistered from OSGi, removedService will deactivate a thread local (used by SchedulerClusterInvokeAcceptor), populate a map that will effectively ask all callee nodes to ignore the call, broadcast the method call to the cluster (where the callee nodes will ignore it), and then attempt to remove a trigger for the job from the local node.
With LPS-59681, Liferay added API methods to SchedulerEngineHelper to help register your scheduled job, which is probably a MessageListener if you’re coming from earlier releases:
- register: Adapts a regular
MessageListeneras aSchedulerEventMessageListener, registers the adapted wrapper as an OSGi component, and remembers it so that it can be manually unregistered by callingunregister - unregister: Unregisters the
SchedulerEventMessageListenercomponent corresponding to theMessageListener, assuming you created one by callingregister
You can create regular MessageListener classes and register them from OSGi, as is done in an existing blade sample (BladeSchedulerEntryMessageListener). Alternately, you can also create a component that provides the SchedulerEventMessageListener directly, but that comes with some caveats which will be described later in the code samples.
Understanding ClusterSchedulerEngine
Now that we have a basic understanding of SchedulerEngine, the next thing we want to know is how scheduler works in a clustered environment.
As noted earlier, ClusterSchedulerEngineConfigurator instantiates a ClusterSchedulerEngine, providing it with an existing SchedulerEngine that will perform all the actual work, as well as any other OSGi-managed classes (because the lifecycle of ClusterSchedulerEngine is managed by Liferay, not OSGi).
The real magic of ClusterSchedulerEngine doesn’t exist in the class itself, but in ClusterableProxyFactory. We essentially instantiate a dynamic proxy around ClusterSchedulerEngine, and our invocation handler checks for a Clusterable annotation on every method declared by its target object. The elements set against that annotation will then be used to determine how that method call should work in a clustered environment.
If you’ve never seen an annotation before, you may want to read up on Annotation Basics from Oracle’s Java tutorials for additional background.
Clusterable
All methods on Clusterable currently have Javadocs, but it’s worth mentioning the methods again here.
- onMaster: Whether to invoke this method on the master node rather than the local node (if the local node is not a master node). If set to
true, Liferay will attempt to route the method call to the master node. If the current node is not the master node, parameters will be serialized on the invoking node and sent to the master node, and the return value will be serialized on the master node and sent back to the invoking node. - acceptor: If
invokeOnMasteris not set (or set explicitly to false), Liferay will load a class implementing the ClusterInvokeAcceptor. Once you specify this value, Liferay will attempt to call an internal _invoke method withinClusterableInvokerUtilon every node. Within this invocation, each node will call theacceptmethod of theClusterInvokeAcceptor, and if it is true, it will proceed to invoke the original method that we had proxied.
The acceptor element can be confusing the first time you encounter it without reading the implementation for ClusterableInvokerUtil.invokeOnCluster. To summarize, within invokeOnCluster, Liferay calls ClusterableInvokerUtil.createMethodHandler to create a serializable method with additional environment information (which, if you’re familiar with functional programming, you can think of as equivalent to creating a closure) that will be invoked on all nodes on a cluster.
With that, we can understand that once the Clusterable annotation is set, and the onMaster element is set to false the caller node will unconditionally attempt to invoke the method on all nodes in the cluster. The ClusterInvokeAcceptor will be called on each callee node to determine whether the method call proceeds on that node.
In other words, the ClusterInvokeAcceptor is used to determine whether a callee node is ready to invoke the method. It does not prevent the caller node from broadcasting the invocation to the cluster.
ClusterSchedulerEngine
So now that we have a background on Clusterable, we can use that background to understand how ClusterSchedulerEngine does in a cluster.
First, let’s look at the methods where the annotation has the element onMaster set to true. It turns out that the only methods that are annotated in this way are the methods that retrieve metadata about scheduled jobs that we’d talked about when we went over LPS-7397.
Therefore, we can think of this as saying that whenever you use the API to retrieve metadata about scheduled jobs, all nodes will ask the master node for that information. This means that no matter what node you are on (whether you’re doing it from a Groovy script or you’re writing your own scheduled job management logic), these API calls will provide what the master node believes is the state of those scheduled jobs.
Next, let’s look at the methods where the annotation has the element acceptor set. It turns out that these are all the methods that modify the state of a job, which were introduced in LEP-6187 (the initial creation of scheduler), LPS-7395 (the API we’d added for a scheduled job management portlet that never came to be), and LPS-7397 (more of the API we’d added for that scheduled job management portlet that never came to be).
All of them have the same value set (SchedulerClusterInvokeAcceptor.class), which is to say that every one of these methods uses the same rules to decide whether to execute the method. This means that if you attempt to modify the state of a scheduled job on any node, all of the other nodes will be informed of the method call.
An important thing to note is that each node decides whether to carry out the invocation via SchedulerClusterInvokeAcceptor. In other words, the acceptor does not decide whether the call is relayed to the rest of the cluster. All method invocations that do not have the onMaster element set to true will always
What’s interesting is that when you look at the actual ClusterSchedulerEngine implementation in each of these methods, they have special logic to check whether they are the master node. In other words, for scheduler in particular, having an acceptor set is the same as onMaster; the only difference is whether all of the other nodes in the cluster should be notified.
This leaves the following methods that have no annotation, which include the initialization and the destruction of the scheduler engine implementation.
To summarize everything so far, we know the following. There are exactly two methods in ClusterSchedulerEngine (start and shutdown) that are not broadcast to a cluster. With the built-in Liferay implementation based on Quartz, Quartz itself has some cluster-management capabilities built into it. As a result, while it’s possible that non-default implementations of a scheduler might want clustering logic, Liferay itself won’t provide this logic out of box because its default implementation does not need it
Importantly, for all other methods that are part of the SchedulerEngine interface, calling the API is equivalent to asking the master node to execute the method, while all other nodes update metadata assuming that the master node has completed that execution, unless that node is not ready to recognize that invocation call, as determined by SchedulerClusterInvokeAcceptor.
Disappearing Scheduled Jobs
So with all of this knowledge, we can now revisit the disappearing MEMORY_CLUSTERED scheduled jobs problem mentioned earlier.
To understand what happened, first we need some background information on MEMORY_CLUSTERED, and how it relates to everything we’ve learned about ClusterSchedulerEngine, which provides the functionality.
Conceptually, a MEMORY_CLUSTERED job was added in LPS-15343, and it equates to a job that is not persisted in any way (in the default Quartz implementation, it uses a RAMJobStore), but it retains the desirable property of a persisted job where only one node executes the scheduled job. This is achieved through ClusterSchedulerEngine, which adds a mechanism for limiting scheduled jobs to one node, by only notifying the scheduler engine of one node about the job.
In the initial implementation, the first node to successfully acquire an entry in the Lock_ table in Liferay would run MEMORY_CLUSTERED scheduled jobs. With LPS-51058, this converted into running jobs on the coordinator node elected by JGroups, which effectively resulted in MEMORY_CLUSTERED jobs always running only on the node designated as the JGroups coordinator node. Then, in order to resolve LPS-66858, Liferay added a solution where each node in a cluster maintained metadata on the timing of scheduled jobs, so that it would remember the proper start times for MEMORY_CLUSTERED jobs if it are chosen as the new JGroups coordinator.
The root cause of the problem lay in assumptions about what would happen with the following block of code:
@Deactivate
protected void deactivate() {
try {
_schedulerEngineHelper.unschedule(_schedulerEntryImpl, StorageType.MEMORY_CLUSTERED);
}
catch (SchedulerException se) {
}
_schedulerEngineHelper.unregister(this);
}
@Reference(target = ModuleServiceLifecycle.PORTAL_INITIALIZED, unbind = "-")